Portfolio
Portfolio
Baltic Place, Gateshead
- CLIENT: McMullen Architectural Limited
- PROJECT VALUE: £328,000.00
These prestigious office blocks consists of over 4000 square meters schuco fw 50+ curtain wall, structurally glazed curtain wall, planar glazing, terracotta tiles, bespoke soffits column cashents. The level of skilled labour on this project peaked at 30 operatives.
Completed October 2008
Bridgewater Place, Leeds
- CLIENT: Exterior profiles Limited
- PROJECT VALUE: £550,000
With over 5000 square meters of UCW Unitised curtain wall + 2000square meters of planar glazing, this prestigious office and retail development utilised 40 highly skilled operatives for the installation.
Completed September 2008
Brindley Place, Birmingham
- CLIENT: Glamalco
- PROJECT VALUE: £500,000
8000 square meters of Reynaers Stick curtain wall and 800+square meters of James & Taylor stone rainscreen cladding. This 14 storey office block is utilising 25+ skilled curtain wall installers. Plus a full time storeman, forklift driver and lorry driver to transfer materials from our off site compound to the site on a daily basis. The curtain wall system being used has been developed by Reynaers in conjuction with Glamalco to allow the façade to be glazed internally so as to allow any future breakages to be re placed without having to bring in external lifting & access equipment.
Completed December 2009
Burnley College, Burnley
- CLIENT: GB Denstone
- PROJECT VALUE: £400,000
Description: This high specification new build college comprises of over 3200 square meters of Glass Reinforced Concrete (GRC) panels utilising 20 highly skilled operatives for the installation.
Completed October 2009
Dart Square, Sheffield
- CLIENT: Apic Ltd
- PROJECT VALUE: £210,000
Project consisted of 250 punch hole windows. Also 130Sq meters ground floor curtain wall lobby and doors.
Completed Jan 2022
Digital Campus, Sheffield
- CLIENT: Client: G.B Construction Supply Group
- PROJECT VALUE: £270,000
This new build office development consisted of over 1,600 square
meters of Glass Reinforced Concrete (GRC) panels fitted to staircores, roof areas and incorporated a faceted plinth feature.
The project utilised 15 highly skilled installersand a fork lift truck driver. All access equipment, Scaffold & MEWPS were provided
by Neepsend Facades as part of the installation package.
Completed September 2008
Greater Manchester Police HQ
- CLIENT: Mcmullan Architectural Ltd
- PROJECT VALUE: 309,077
Installation of Stick and Bolted Curtain Wall.Copings and Brise Soliel Job included all mastic pointing work.
Completed October 2011
J1 & J2 Sheffield
- CLIENT: Glamalco Limited
- PROJECT VALUE: £625,000
Consisting of over 10000 square meters of schuco fw 60 + curtain wall and 1000 square meters of terracotta tiles, The project required 30 highly skilled operatives to carry out the installation work on this high profile home office development, which has been built to a “clean, green & modern” specification.
Completed
Media City, Salford
- CLIENT: Mcmullan Architectural Ltd
- PROJECT VALUE: £250,000
Completed October 2008
MSCP, Sheffield
- CLIENT: McMullen Architectural Limited
- PROJECT VALUE: £328,000
This multi storey car park & casino comprises of over 5500 square meters of Ascolit rainscreen cladding and 1400 square meters of schuco FW60+ curtain wall. We are utilising 30 skilled operatives working to a compressed site programme.
Completed October 2008
National Graphene Insitute, Manchester
- CLIENT: Lakesmere
- PROJECT VALUE: £200,000
Completed September 2011
NO.1 Wembley City
- CLIENT: GB Denstone Ltd
- PROJECT VALUE:
Completed
Office 2, St Pauls, Sheffield
- CLIENT: McMullen Architectural Limited
- PROJECT VALUE: £250,000
DESCRIPTION: This 7 storey office block consists of over 3000 square meters MAS unitised curtain wall over 1000 square meters MAS 50 S.G curtain wall. This project is utilising 20 skilled operatives to carry out the installation works.
Due for completion October 2008
Completed October 2008
Reading
- CLIENT: Parry Bowen Ltd
- PROJECT VALUE: £620,000
This 10 storey office block consists of over 6880 m2 of Schuco Skyline S65 unitised curtain wall. Over 4500 m2 of Schuco FW60+ curtain wall. This project is utilising up to 20 skilled operatives to carry out the installation works. Due for completion September 2009
Completed September 2009
The Louvre, Paris
- CLIENT: Wagner Biro
- PROJECT VALUE: 400,000 Euros
This was a prestigious new gallery at the Louvre Paris designed by Mario Bellini and Rudy Rcciotti. The project requirement was to install and seal a 6800m2 undulating glass roof which consisted of 2400 triangulated glass panels. The roof had to be then screened by fitting an outer layer of gold and silver aluminum shading panels. The project utilized, on average, between 15 -20 highly skilled installers and a full time manager.
Completed 2010
Transport House, Sheffield
- CLIENT: Hurricane Ltd
- PROJECT VALUE: £328,000
With over 5000 square meters of UCW Unitised curtain wall + 2000square meters of planar glazing, this prestigious office and retail development utilised 40 highly skilled operatives for the installation.
Completed March 2010
Wag Llandudno, Wales
- CLIENT: Robertson
- PROJECT VALUE: £500,000
These prestigious office blocks consists of over 4000 square meters schuco fw 50+ curtain wall, structurally glazed curtain wall, planar glazing, terracotta tiles, bespoke soffits column cashents. The level of skilled labour on this project peaked at 30 operatives.
Completed March 2010